Please call for an updated personalized quote.
 
Page 1 of 4
 
 
SUBJECT: GOSS & DELEEUW 1-2-3 ROTARY TRANSFER MACHINE REBUILD
 
We are pleased to present a quote to rebuild your Rotary Transfer Machine. The following items will be completed:
 
I. DISASSEMBLY
A) Complete disassembly of your machine
Remove existing guards & covers
Remove existing lube system
Remove existing electrical system
Remove existing hydraulic system/components
Remove existing pneumatic system/components
B) Clean and inspect machine, base, and components
Steam clean, remove all build-up
Check machine base for cracks, imperfections, defects, and excessive wear
Check components for ability to reuse
II. SYSTEMS
A) Mechanical
Ball Screw Systems to eliminate feed cams
Design and build all components to install three ball screw systems
Design and assemble mounts for adapting a servo to each ball screw
B) Electrical
Purchase and install a new Allen-Bradley ControlLogix System
PanelView 1000 Color Display with keypad
4 211 mm x 158 mm Color Active Matrix Thin Film Transistor (TFT) display; 640 x 480 pixel resolution
4 16 Function keys, Numeric keypad, Cursor Control keys
4 Operator interface and fault messaging
 
Purchase and install a new electrical system:
Total rewire
New electrical components, including push buttons, switches, junction boxes, ducting, and electrical cabinet with back panel and inter-locking disconnect Identification tags for all push buttons, switches, solenoids, regulators, axes, and pressure switches Engrave the wireway covers in the main electrical enclosure to identify the electrical components Allen-Bradley Servo MotorsConsists of three servo motors, three servo axis modules, three feedback and power cables
Allen-Bradley Servo Indexer- Consists of a servo motor and indexer
C) Lube
Purchase and install a new automated lubrication system for the ways
Low level alarm
Replace all lube lines, lube injectors and pressure switches
D) Pneumatics
Purchase and install new pneumatic system
Replace all pneumatic lines, switches, regulators, valves
E) Coolant
Purchase and install new coolant system components
Replace all coolant lines, switches, and valves
III. MACHINING/REASSEMBLY
A) Grind, Scrape & Fit
The bed ways of the machine will be precision ground and then scraped
The three upper slide ways will be precision ground on a way grinder and then hand scraped and fit to the bed
B) Tapping Heads
Check and rebuild all three tapping heads
Customer will furnish the lead screws & nuts
C) Drilling Heads
Check and rebuild the two drilling heads
D) Clamping Stations
Check and rebuild all four clamping stations
E) Complete reassembly of the machine
IV. FABRICATION
A) Design and build all protective covers and guarding for safe operation
Fabricate an operator station
V. PAINT
A) Prepare and paint the entire machine to your specified color.
VI. ENGINEERING SUPPORT
A) Develop and install software to troubleshoot and operate system
B) Provide documentation consisting of the following:
Machine Software
Electrical System
Mechanical Assembly
Lube System
Pneumatic System
Coolant System
VII. RUNOFF
A) Prepare machine for runoff at Inter-Motion with your parts
Includes power-up of machine and debug of the electrical system
Perform a preliminary runoff
Set up a runoff schedule with you
VIII. SHIPPING
A) Prepare the machine for shipment to your facility after a successful runoff and your approval of the machine
Complete any agreed upon changes resulting from runoff
Cleaning of the machine
Wrapping the machine with a protective plastic wrap
Standard shipment procedure, which includes a thorough six-page checklist of items that will be completed before the machine ships
 
 
 
Total Estimated Price $185,300.00
 
We would like to offer you the following options for your machine:
 
Option 1 &endash; Leveling Pads
Purchase leveling pads for the machine.
Six (6) to eight (8) pads for machine leveling
Price per Pad $150.00
 
Delivery: To be determined at issuance of purchase order
F.O.B: Nebraska
Terms: 50% After teardown at Inter-Motion, Inc.
40% After acceptance at Inter-Motion, Inc.
10% After Installation at your location not to exceed thirty (30) days from date of shipment